Here is the former bridge over the stream at the Greensboro gauge site. Prior to the installation of the ISCO 6700 Sampler on May 31, 2000 daily water samples were taken from this bridge by a local resident. Now samples are taken by the autosampler which has an intake hose which begins in the stream. The bridge was taken down in 2001 and has since been replaced with a tramway.